St. Catherine Creek Biological Monitoring in support of Landscape Model Development
-
The Pvt. John Allen National Fish Hatchery, the Baton Rouge Fish and Wildlife
Conservation Office and the Gulf Coast Plains/Ozark Landscape Conservation
Cooperative (GCPO LCC) are partnering to develop a proactive approach in identifying problem areas and delivering aquatic habitat restoration actions, on the ground, before the problems reach an irresolvable level. This joint effort is already in the full process of data collection and evaluation to develop a spatially explicit model of aquatic habitats found on the St. Catherine Creek National Wildlife Refuge in MS. The full spectrum of biological needs for both of the alligator gar, paddlefish, and other floodplain dependent species are found in this floodplain. The existing project is already developing remote sensing capacity to characterize all aquatic habitats found in this interior floodplain in terms of the biological needs of aquatic species. In addition, data on bathymetry, water quality parameters, flood frequency and duration periods and vegetative types are being collected in order to accurately portray and verify habitat characteristics in the spatial model. Hydro acoustic and side scan imaging will be utilized in order to deliver the highest quality data available to resource managers at the present. Quantitative biological information is necessary to complete the suite of data for the model. Abundance and distribution of selected fish needs to be collected in conjunction with environmental data in order to adequately characterize the importance of various physicochemical conditions to aquatic life. This project will collect those data on St Catherine Creek NMR. This project is currently on-going.
Located in
Funded Projects
/
SARP Projects W2B
-
Stream Bank & Riparian Restoration along the Wild and Scenic Cossatot River on the Ouachita NF
-
Six riparian sites have severe erosion from loss of riparian vegetation and heavy recreational use. Riparian habitat function will be restored by stabilizing stream banks and planting vegetation. Stream habitat cover will increase with addition of materials to repair stream banks. Campsites will be designated and hardened. To measure effectiveness, water samples taken every 3 months over the past 4 years will continue for at least the next 4 years by the Cossatot River Watch Stream Team to compare pre- and post-restoration.
Located in
Funded Projects
/
SARP Projects W2B
-
Tipton Creek Culvert Replacement, NC_FY10 Project
-
In the summer of 2011 the culvert at the Davis Creek Road (FSR 420) crossing of Tipton Creek was
removed and replaced with a concrete arch, stream simulation crossing for the purpose of passing
aquatic organisms, where the existing culvert was known to be a barrier to aquatic passage due to
velocity and outlet drop. The crossing was sized using the 100-year flow calculation derived from the
USGS Regression Equation for the mountains of North Carolina. Additionally, the width of the crossing
was designed to accommodate a bankfull flow channel dimension plus a small area of floodplain. The
channel was reconstructed through the crossing using the dimension, pattern, and profile of the
reference reach upstream. The new channel was constructed using imported boulders and onsite alluvial
materials. Grass seed was sown, and trees and shrubs were planted, both potted and live-stakes. Over
the last year since construction, the site has experienced several small flood events. The site remains
stable, passable to all aquatic species, and looks more and more natural every year as planted and
natural vegetation establishes.
Located in
Projects
/
Project Completion Reports
-
Upper Savannah Biological Assessment of Redeye Bass
-
Located in
Funded Projects
/
SARP Projects W2B