EBTJV 10 Year Anniversary Info Graphic (2014)
-
This info graphic summarizes the EBTJV's accomplishments during its first 10 years (2004-2014).
Located in
Science and Data
/
EBTJV Reports
/
EBTJV Print Material
-
EBTJV Accomplishment Report and Work Plan for FY15 FWS-NFHAP Funding
-
This document contains the required material needed to apply for FY15 FWS-NFHAP funding.
Located in
Groups
/
…
/
2014 Steering Committee Conference Call Summaries
/
December 16, 2014 Steering Committee Conference Call Documents
-
EBTJV’s FY19 NFHAP Workplan and Accomplishment Report
-
This document contains the EBTJV's responses to the FWS's FY19 NFHAP Workplan and Accomplishment Report.
Located in
Groups
/
…
/
Conference Calls
/
2019 Steering Committee Conference Call Summaries
-
Enhancing Connectivity in the Androscoggin River Watershed, ME_FY08 Project
-
This project improved fish passage and assessed fish passage barriers within the watershed.
Located in
Projects
/
Project Completion Reports
-
Enhancing Connectivity in the West Branch Narraguagus River, ME_FY11 Project
-
This project replaced degraded road-stream crossings (culverts) with bankfull channel width spanning open bottom structures.
Located in
Projects
/
Project Completion Reports
-
F16AC01200 Performance Report: 2/21/2017- 3/31/2018
-
This report describes accomplishments made under this FWS Service Agreement.
Located in
Projects
/
EBTJV Operational Grants
/
FY16 EBTJV Coordination and Operations_FWS-NFHAP Funded Agreement
-
F18AC00818 Interim Performance Report: 4/1/2019 – 9/30/2019
-
This report describes accomplishments made under this FWS Service Agreement.
Located in
Projects
/
EBTJV Operational Grants
/
FY18 EBTJV Coordination and Operations_FWS-NFHAP Funded Agreement
-
FY14 EBTJV Coordination and Operations Project - Final Report
-
This report details the accomplishments achieved during the FY14 EBTJV Coordination and Operations Project that was supported by FWS-NFHAP funding.
Located in
Groups
/
…
/
2016 Steering Committee Conference Call Summaries
/
March 15, 2016 Conference Call Documents
-
Habitat Restoration in Chattahoochee National Forest Streams, GA_FY07 Project
-
Twenty-six habitat improvement structures were installed in six Chattahoochee NF streams. In addition, a fish barrier was constructed in Tate Branch to exclude invasive Rainbow Trout, thus improving habitat for Southern Appalachian Brook Trout.
Located in
Projects
/
Project Completion Reports
-
Jam Black Brook Culvert Replacement, ME_FY12 Project
-
The goals of the project were: (1) To remove an obstruction to upstream
fish passage for brook trout, Atlantic salmon and other resident and migratory fish. (2) To
restore access to 9.8 miles of stream habitat upstream of the obstruction. (3) To restore natural
sediment and woody debris transport through the crossing site. (4) To improve flood capacity at
the Magog Road crossing, reducing the risk of debris jams or overtopping the road. (5) To
provide a demonstration site in mid‐coast Maine for an appropriate stream crossing developed
in cooperation with the municipality.
Located in
Projects
/
Project Completion Reports