Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

43 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
File EBTJV 10 Year Anniversary Info Graphic (2014)
This info graphic summarizes the EBTJV's accomplishments during its first 10 years (2004-2014).
Located in Science and Data / EBTJV Reports / EBTJV Print Material
File EBTJV Accomplishment Report and Work Plan for FY15 FWS-NFHAP Funding
This document contains the required material needed to apply for FY15 FWS-NFHAP funding.
Located in Groups / / 2014 Steering Committee Conference Call Summaries / December 16, 2014 Steering Committee Conference Call Documents
File Troff document EBTJV’s FY19 NFHAP Workplan and Accomplishment Report
This document contains the EBTJV's responses to the FWS's FY19 NFHAP Workplan and Accomplishment Report.
Located in Groups / / Conference Calls / 2019 Steering Committee Conference Call Summaries
File Troff document Enhancing Connectivity in the Androscoggin River Watershed, ME_FY08 Project
This project improved fish passage and assessed fish passage barriers within the watershed.
Located in Projects / Project Completion Reports
File Troff document Enhancing Connectivity in the West Branch Narraguagus River, ME_FY11 Project
This project replaced degraded road-stream crossings (culverts) with bankfull channel width spanning open bottom structures.
Located in Projects / Project Completion Reports
File F16AC01200 Performance Report: 2/21/2017- 3/31/2018
This report describes accomplishments made under this FWS Service Agreement.
Located in Projects / EBTJV Operational Grants / FY16 EBTJV Coordination and Operations_FWS-NFHAP Funded Agreement
File F18AC00818 Interim Performance Report: 4/1/2019 – 9/30/2019
This report describes accomplishments made under this FWS Service Agreement.
Located in Projects / EBTJV Operational Grants / FY18 EBTJV Coordination and Operations_FWS-NFHAP Funded Agreement
File Troff document FY14 EBTJV Coordination and Operations Project - Final Report
This report details the accomplishments achieved during the FY14 EBTJV Coordination and Operations Project that was supported by FWS-NFHAP funding.
Located in Groups / / 2016 Steering Committee Conference Call Summaries / March 15, 2016 Conference Call Documents
File Troff document Habitat Restoration in Chattahoochee National Forest Streams, GA_FY07 Project
Twenty-six habitat improvement structures were installed in six Chattahoochee NF streams. In addition, a fish barrier was constructed in Tate Branch to exclude invasive Rainbow Trout, thus improving habitat for Southern Appalachian Brook Trout.
Located in Projects / Project Completion Reports
File chemical/x-pdb Jam Black Brook Culvert Replacement, ME_FY12 Project
The goals of the project were: (1) To remove an obstruction to upstream fish passage for brook trout, Atlantic salmon and other resident and migratory fish. (2) To restore access to 9.8 miles of stream habitat upstream of the obstruction. (3) To restore natural sediment and woody debris transport through the crossing site. (4) To improve flood capacity at the Magog Road crossing, reducing the risk of debris jams or overtopping the road. (5) To provide a demonstration site in mid‐coast Maine for an appropriate stream crossing developed in cooperation with the municipality.
Located in Projects / Project Completion Reports