EBTJV DLLT Funding Application 2013
-
PROJECT TITLE:
2014 Restoring habitat connectivity in Machias & Saint Croix River tributary streams ME: EBTJV&NFHAP
Located in
Projects
/
…
/
2014 Projects
/
2014 Restoring Habitat Connectivity, Machias & Saint Croix River tributary streams ME: EBTJV&NFHAP
-
Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
-
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
-
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in
Funded Projects
/
EBTJV Projects
-
Fact Sheet for Lynn Camp Prong, Tennessee
-
Fact sheet for Lynn Camp Prong, Tennessee
Located in
Projects
/
…
/
2007 Projects
/
Lynn Camp Prong, Tennessee
-
Fact Sheet for Lynn Camp Prong, Tennessee
-
Fact sheet for Lynn Camp Prong, Tennessee
Located in
Funded Projects
/
EBTJV Projects
/
Lynn Camp Prong, Tennessee
-
Final Ranking of Brook Trout Conservation Project Proposals - FY17
-
This document contains the final ranking of Brook Trout conservation project proposals submitted to the EBTJV for FY FWS-NFHAP funding considerations.
Located in
Groups
/
…
/
2016 Steering Committee Conference Call Summaries
/
December 7, 2016 EBTJV Steering Committee Meeting Documents
-
Flowage at W. Branch Amazon Brook 9.13
-
Photo of flowage above existing culvert on the west Branch of Amazon Brook at Amazon Road
Located in
Projects
/
…
/
2014 Projects
/
2014 Restoring Habitat Connectivity, Machias & Saint Croix River tributary streams ME: EBTJV&NFHAP
-
Former dam on Hamant Brook in Massachusetts
-
Dam removed from Hamant Brook in Massachusetts, as part of a 2010 project. 8 miles of stream were re-opened.
Located in
Projects
/
…
/
2010 Projects
/
Hamant Brook Culvert Replacement, Old Sturbridge Village, Massachusetts
-
Friends of Winooski River completion report 2022
-
Friends of the Winooski River completed the removal of Camp Wihakowi Dam in Northfield, Vermont in October 2020. The circa 1920 dam was causing flooding upstream and sediment pollution downstream. Complete removal of the dam resulted in impressive gains: it reconnected 6 miles of Bull Run and an additional 21 miles of upstream habitat, allowed the stream to once again access the larger floodplain, and protected downstream habitat from the smothering effects of sedimentation. But of course, a dam removal project doesn't stop when the stone and concrete has been removed. To improve recovery and stabilization, project partners performed additional work on the pedestrian bridge, access road, and former pool area in 2021. Monitoring shows the river is free flowing, sediment transport has been naturalized, the restored floodplains are successfully vegetating, and habitat has been improved. According to EBTJV's calculations, the project brought an estimated $14.6M in socioeconomic benefits.
Located in
Projects
/
Project Completion Reports
-
FY18 EBTJV/FWS-NFHAP Project Rankings
-
This document provides a listing of Brook Trout conservation projects ranked by the EBTJV Project Review Team for possible FY18 FWS-NFHAP funding support.
Located in
Groups
/
…
/
2017 Steering Committee Conference Call Summaries
/
December 19, 2017 EBTJV Steering Committee Call